Hamley Bridge, South Australia
Project Description
Fleurieu Civil & Construction were engaged by SA Water to install 981m of DN300 DICL in Hamley Bridge.
The project included the development of a new service road and the management of local vegetation through thorough environmental considerations.
The construction included:
981m of DN300 DICL pipe (ductil iron cement lined)
48m of DN100 DICL
Installation of 3 stop valve assemblies
6 x stop valve assemblies
3 x fire plugs
Reinstatement of roads
Full system flush, chlorination, and commissioning
The project was executed on time, on budget, and with zero safety events. A great achievement by the team working in a remote environment.