Koonnibba, South Australia

Project Description

In partnership with a Tier 1 Contract, Fleurieu Civil & Construction helped construction in the provision of equipment and operators in the refurbishment and installation of turning lanes at the Koonibba / Eyre Highway intersection (40km West of Ceduna).

Jobs performed:

  • Boxout to subgrade (excavator)

  • Rock Excavation

  • PM2/20 Subgrade

  • Earthworks trim (swale shaping)

  • Drainage

  • PM1/20 base course

  • Culvert installation

  • Final Trim

  • Topsoil re-spread

Previous
Previous

Hamley Bridge